Week 32: Drywall Installed

The drywall installation wrapped up this week and it was Absolutely Amazing to walk in and see all the walls with drywall.  The floors were covered with paper getting ready for  the taping & mudding next week so it looked crazy clean in there too!  Spencer and I visited on Saturday and had so much fun checking out each room.  We also ran some errands including heading to Home Depot for some tools to take off the plumbing fixtures on our bathtub and to Sherwin Williams to check out different paint sheens.  Surprisingly, Sherwin Williams has a great little coloring table for kids to sit at – perfect for Spencer!

Week 31: Siding Complete, Insulation Complete, Gutters Complete, & Drywall Started

I think the word “milestones” is appropriate for this week.  We began 2016 with some huge accomplishments…siding was finished up this week.  Insulation was started and completed, and drywall began!

Let’s start with siding…or really end with siding!  It’s very exciting to see the entire house completely done with siding.  There’s only a couple of little things that are still missing – the corbels to add a bit of detail on the gables and the mudroom front door still need to be done.  But realistically, it feels like we’re done!  The top of the great room gable on the back of the house was completed this week, and the siding on the backside of the garage was finished as well too.

On the inside of the house, insulation was added which included insulating all of the walls – exterior and interior.  I walked through the house on Wednesday and it was amazing that they were done with it – they only started on Monday!  It’s pretty wild now to walk through it because it feels so much darker than it did before.  Light used to penetrate into every room because it was just studs.  Now the rooms without windows – like the powder room feel sooooo dark.  Which is probably half because the light can’t enter the room and half because all of the insulation is brown.  Once the sheetrock goes up, I’m sure those rooms will feel a bit lighter.

And drywall was started!  On Wednesday, they loaded all the drywall into the house and they started working on it the next day. By the end of the day Thursday our entire master bedroom was completed.  And by the end of the week there was so much completed!  All of the ceiling are done and so are all of the walls in the boys’ area.

Finally, gutters were done this week too! I originally wanted the half round gutters, but apparently they hold less rain and considering the amount of pine needles and rain that we have in the northwest, I opted for the more practical solution.  Regular k-style gutters it is!

Week 20: We Have a Roof…plus More Ceiling Details!

Joel was waiting so long for this day to finally come…with the rainy weather beginning, all I kept hearing from him is how he doesn’t like that the house is getting wet with water puddling up on the concrete downstairs and the plywood subfloor upstairs.  “That can’t be good for it,” he’d say.  But the wait is over!  We have a roof!!  Last Friday they had all of the material up on the roof and on Monday morning they began.  And now at the end of the week, they’re about 95% done.  Still need to finish up some roof vents and the well house and I think it’s finished.  Ya-hoo!!

The roof is on!

The roof is on!

Here's a closer picture of the front entry.

Here’s a closer picture of the front entry.

Half-way through the week, here's what the back of the house looks like (from standing WAY back at the well house).

Half-way through the week, here’s what the back of the house looks like (from standing WAY back at the well house).

Oh yeah, and they built the well house today! Isn't it cute?

Oh yeah, and they built the well house today! Isn’t it cute?  The boys haven’t seen it yet, but when they do, I bet they’re going to wish it were their play house!

And, even better than the roof (although probably not for Joel) is that they worked on the great room ceiling and the kitchen ceiling!  We had them lower the great room ceiling and not only was that done, but the locations for where the faux beams are going to be in there were placed.  And the locations of the coffered ceiling in the kitchen was done too!   I LOVE them!!  The placement in the rooms looks so great and I can’t wait for the beams to be fully built, but for now, just seeing where they’ll go is ultra exciting!

The small entry has a tray ceiling.

The small entry has a tray ceiling.

The great room ceiling was lowered to a more comfortable height, and the faux beams were added. LOVE!!!

The great room ceiling was lowered to a more comfortable height, and the faux beams were added. LOVE!!!

On the left side of the room, the 'beams' align with the fireplace and built-ins.

On the left side of the room, the ‘beams’ align with the fireplace and built-ins.

And on the right side of the room, the 'beams' flow directly into the kitchen's coffered ceiling.

And on the right side of the room, the ‘beams’ flow directly into the kitchen’s coffered ceiling.

The coffered ceiling in the kitchen looks AMAZING!

The coffered ceiling in the kitchen looks AMAZING!

And they also continued to work on the plumbing this week (not so exciting, but I guess it’s still important) 🙂  We also worked to figure out the locations for the HVAC cold air returns and soffits in the basement.

And the plumbing continued on the house!

And the plumbing continued on the house!