Week 32: Drywall Installed

The drywall installation wrapped up this week and it was Absolutely Amazing to walk in and see all the walls with drywall.  The floors were covered with paper getting ready for  the taping & mudding next week so it looked crazy clean in there too!  Spencer and I visited on Saturday and had so much fun checking out each room.  We also ran some errands including heading to Home Depot for some tools to take off the plumbing fixtures on our bathtub and to Sherwin Williams to check out different paint sheens.  Surprisingly, Sherwin Williams has a great little coloring table for kids to sit at – perfect for Spencer!