I took the day off work on Monday, and my mom and I went to the house at 7:30 am to do the electrical walk thru with Matt and the electrical rep. Over the weekend I drew up my initial thoughts including locations for overhead lights, wall sconces, light switches, TV’s, internet, and locations that I knew I wanted an outlet. That gave us a good starting off point, but we made quite a few changes including adding can lights and additional light switches. From that meeting I had more homework to do – figure out exactly where I want to have bathroom sconces – that means first figuring out bathroom mirrors. Ugh! After wrapping up the electrical walk thru we went to look at more finishes like tile and counter tops…which we still haven’t figured all of that out exactly. More on that another day 😉
The HVAC also started this week and the plumbing continued to be installed. Among other things, the fireplace was installed which was exciting to see! And the majority of the ductwork was run – including locations that will need soffits in the lower level. I absolutely despise soffits, but I think ours will be in locations that won’t be too noticeable – mainly limited to storage rooms and the boys’ playroom. We settled on going with heat pumps for heating & cooling with a furnace for backup. And we actually decided to have two of these systems for the house – one for upstairs and one for downstairs. Since it’s always cooler in basements, we didn’t want that temperature regulated by the upstairs temp. This way, we can keep it nice and toasty down there for the boys.

I loved seeing the fireplace installed this week…it looks awesome (even if it is all covered up still).
And it was also Spencer’s 5th birthday on Friday and Halloween on Saturday! We had lots of fun celebrating with trick or treating at my work on Thursday, a family night out on Friday, and a Halloween Party at my sister’s on Saturday!