Week 20: We Have a Roof…plus More Ceiling Details!

Joel was waiting so long for this day to finally come…with the rainy weather beginning, all I kept hearing from him is how he doesn’t like that the house is getting wet with water puddling up on the concrete downstairs and the plywood subfloor upstairs.  “That can’t be good for it,” he’d say.  But the wait is over!  We have a roof!!  Last Friday they had all of the material up on the roof and on Monday morning they began.  And now at the end of the week, they’re about 95% done.  Still need to finish up some roof vents and the well house and I think it’s finished.  Ya-hoo!!

The roof is on!

The roof is on!

Here's a closer picture of the front entry.

Here’s a closer picture of the front entry.

Half-way through the week, here's what the back of the house looks like (from standing WAY back at the well house).

Half-way through the week, here’s what the back of the house looks like (from standing WAY back at the well house).

Oh yeah, and they built the well house today! Isn't it cute?

Oh yeah, and they built the well house today! Isn’t it cute?  The boys haven’t seen it yet, but when they do, I bet they’re going to wish it were their play house!

And, even better than the roof (although probably not for Joel) is that they worked on the great room ceiling and the kitchen ceiling!  We had them lower the great room ceiling and not only was that done, but the locations for where the faux beams are going to be in there were placed.  And the locations of the coffered ceiling in the kitchen was done too!   I LOVE them!!  The placement in the rooms looks so great and I can’t wait for the beams to be fully built, but for now, just seeing where they’ll go is ultra exciting!

The small entry has a tray ceiling.

The small entry has a tray ceiling.

The great room ceiling was lowered to a more comfortable height, and the faux beams were added. LOVE!!!

The great room ceiling was lowered to a more comfortable height, and the faux beams were added. LOVE!!!

On the left side of the room, the 'beams' align with the fireplace and built-ins.

On the left side of the room, the ‘beams’ align with the fireplace and built-ins.

And on the right side of the room, the 'beams' flow directly into the kitchen's coffered ceiling.

And on the right side of the room, the ‘beams’ flow directly into the kitchen’s coffered ceiling.

The coffered ceiling in the kitchen looks AMAZING!

The coffered ceiling in the kitchen looks AMAZING!

And they also continued to work on the plumbing this week (not so exciting, but I guess it’s still important) 🙂  We also worked to figure out the locations for the HVAC cold air returns and soffits in the basement.

And the plumbing continued on the house!

And the plumbing continued on the house!