2016-03-05 11.55.21 HDR-2 Published March 5, 2016 at 2448 × 3264 in Week 39: Cabinetry Installed & Tile Progress « Previous Next » I love how my vanity is turning out. The window is centered above the desk area for makeup and getting ready. That desk portion still needs to be lowered to the correct height, but they’re waiting for another piece to do so.