2016-01-09 09.43.35 Published January 10, 2016 at 2448 × 3264 in Week 31: Siding Complete, Insulation Complete, Gutters Complete, & Drywall Started « Previous Next » The backside of the garage was finished this week. They had to install strips of wood on the lower half which is concrete in order to install the siding. The belly band hides the intersection between the upper and lower installations.