2015-10-18 12.13.30 Published October 18, 2015 at 2448 × 3264 in Week 19: Ceiling Details, Cabinetry Walkthrough & Plumbing « Previous Next » The staircase is located back behind the fireplace, and the curvature in the staircase was finished up this week.