2015-10-18 12.11.41 HDR-2 Published October 18, 2015 at 3264 × 2448 in Week 19: Ceiling Details, Cabinetry Walkthrough & Plumbing « Previous Next » By the end of the week, the arches have been added at the front of the house, and the roofing has been delivered and is ready to be installed.